H+H aircrete blockwork was used for the external cavity walls in the new hall, reception, classrooms and kitchen facility.
Six different wall types were used with various decorative renders and locally sourced stone applied to the outside of the building.
Main Contractor: | H Mealing & sons Ltd, The Yard, Northend, Bath, BA1 7ES |
Project: | Batheaston Primary School has undergone refurbishment works to introduce a new hall, reception, classrooms and a kitchen facility. The renovations are part of a wider aim to create a sustainable school that prides itself on its eco credentials. |
Client: | Batheaston CEVC Primary School. |
Build method: | Standard trench fill foundations with aircrete Celcon Plus Blocks Standard Grade used for the foundations and for the inner leaves of all external cavity walls. All homes are finished with unusual sedum roof coverings on single ply membrane. Solar PV panels are installed to a solar fin. Traditional mortar was used throughout the development. |
Value: | The overall project value is £1.7 million which is part of a wider £2.15 million construction project overseen by Bath and North East Somerset Council’s primary capital programme. |
Location: | School Lane, Northend, Bath, BA1 7EP |
Type of Contract: | School project |
Architects: | Concept design - Kendall Kingscott, Lime Kiln Close, Stoke Gifford, Bristol, BS34 8SR Detail design - CMS Bath Ltd, 51-53 High Street, Corsham, Wiltshire, SN13 0EZ |
Aircrete Contractor: | H Mealing and Sons carried out all blockwork themselves. |
Build time: | Developments at Batheaston Primary School began in July 2010 and the project was completed in September 2011. |