Case Studies

Carlyle Ave Apartment Block

Carlyle Avenue, Brighton Phase Two

Developer Canning Ericsson used H+H’s Thin-Joint System of large format aircrete blocks and quick-drying Celfix Mortar to construct a three-storey apartment block with solid concrete floors to current Building Regulations on a confined site in Brighton.

Read more

Old Coach Station, Great Yarmouth

The Old Coach Station, Great Yarmouth

Contractor R G Carter wanted a construction solution that was more adaptable than a timber frame system, which would allow late design changes to be incorporated into this innovative housing development without too much difficulty.

Read more

Williams Homes, Melton Mowbray

Williams Homes, Leicestershire

Craven Gardens is an exclusive development of eight detached four and five bedroom homes set in the gardens of a former hunting lodge located in the historic market town of Melton Mowbray, using Jumbo Bloks and the Thin-Joint System.

Read more

Fielding Meadow, Ratby

Fielding Meadow, Ratby

Cawrey Homes’ Fielding Meadow development is made up thirty two 2 and 3 bed semi-detached and four 4 bed detached homes. All the homes are built to level 4 of the Code for Sustainable Homes.

Read more

Silk Mills, Somerset

Silk Meadows, Somerset

These show homes by Crest were built using the Rå Build method of construction, ensuring a quicker than usual build time.

Read more

Linden Homes, Colchester

Linden Homes, Colchester

New sustainable neighbourhood designed by Terence O’Rourke. Within this 6.9 hectare site to construct 430 dwellings aimed at first time buyers will provide new homes, an attractive open park and school with useful transport links for the local community.

Read more

Carpenters Place, Bristol

Carpenters Place, Bristol

A three-storey building comprises 21 one bedroom and 3 two-bedroom apartments, as well as secure parking facilities with 17 car park spaces.

Read more

Pinnacle Homes, Basingstoke

The Pinnacle, Basingstoke

Known as the 'Miller Zero' project, the development was built for real customers, as well as a project to take its supply chain, on a journey towards Code level 6 on the 3.65 acre site.

Read more

Royal Berkshire Court, Didcot

Royal Berkshire Court, Didcot

28 new houses built by Wates. The development made use of the Rå Build method of construction throughout and incorporated the 1000th home built using this method.

Read more

Website by ib3