Case Studies

Carlyle Ave Apartment Block

Carlyle Avenue, Brighton Phase Two

Developer Canning Ericsson used H+H’s Thin-Joint System of large format aircrete blocks and quick-drying Celfix Mortar to construct a three-storey apartment block with solid concrete floors to current Building Regulations on a confined site in Brighton.

Read more

Lime Tree Lodge

Lime Tree Lodge

H+H products were selected for this project due to the aircrete’s high thermal performance which helps meet Passivhaus standards. Passivhaus is achieved by the application of high levels of insulation, avoidance of thermal bridging within the structure, low levels of air leakage all of which are qualities addressed with the use of the H+H range of Celcon Blocks.

Read more

Self-Build House

Bourne End Self-Build House

A private one-off custom-build residential home built for a family of four who had lived in Bourne End since 1985. They wanted to buy a new house in the area, having extended their existing bungalow three times, but could find nowhere suitable. This led them to look at custom building a new home on the existing bungalow’s plot.

Read more

Website by ib3