Case Studies

Cameron Close, IOW

Cameron Close Passivhaus, IOW

H+H’’s Thin-Joint System has been used in the construction of a Passivhaus development of 16 semi-detached houses and 12 sheltered accommodation apartments at Cameron Close, Freshwater, on the Isle of Wight.

Read more

Severn Vale Homes

Severn Vale Housing Association

Having used H+H’s Thin-Joint System for more than 10 years, Sherborne Homes again opted for this effective build system when working on their very first housing association project. The Thin-Joint System provides the Sherborne Homes contractors with a hassle free building solution and a great support package that allows for fast and effective construction. It is the tendency of Sherborne Homes to steer away from using timber frame and H+H products offer the perfect solution.

Read more

Orchard Close Case Study

Orchard Close, Wales

Contractor Robert Bishop from RT Bishop, required a swift construction solution as a replacement for timber frame that his team could successfully use to deliver the project on time. H+H’s Rå Build method, using the Thin-Joint System and a combination of H+H Jumbo Bloks and Celcon Foundation Blocks provided the perfect solution.

Read more

Fielding Meadow, Ratby

Fielding Meadow, Ratby

Cawrey Homes’ Fielding Meadow development is made up thirty two 2 and 3 bed semi-detached and four 4 bed detached homes. All the homes are built to level 4 of the Code for Sustainable Homes.

Read more

Stondonfield, Essex

Stondonfield Homes, Essex

The H+H Rå Build method of thin-joint aircrete construction was specified due to aircrete’s diverse application and insulation properties.

Read more

Royal Berkshire Court, Didcot

Royal Berkshire Court, Didcot

28 new houses built by Wates. The development made use of the Rå Build method of construction throughout and incorporated the 1000th home built using this method.

Read more

Website by ib3