The three storey building in Redlands Lane, Fareham, is built in an arc around landscaped gardens on the site of a former dairy. The project also includes six assisted living bungalows, also set out in an arc.
Thin Joint construction was used to ensure construction of this 80 bedroom care home could be completed within a 60-week construction programme.
Principle Contractor: | The Highwood Group |
Client: | Gracewell Healthcare |
Project: | Parker Meadows Care Home |
Project Value: | £4,2 million |
Build Method: | Thin Joint aircrete construction |
Location: | Redlands Lane, Fareham, Hampshire |
Type of contract: | Design and build |
Architect: | PDP Architecture |
Aircrete contractor: | Champion Brickwork |
Build time: | Total build time from start on site was just 60 weeks |